JOB TOP - reduce minutes for the last minutes

Hi,

is it possible to change the 30 minutes described here:
This feature allows CPU load and Memory usage tracking of running processes in the time (for last 7 days).
OS agent takes 20 processes which utilize CPU the most for last 30 minutes and sends their CPU utilization and memory usage to the LPAR2RRD server.

to for example the last 5 Minutes?


thanks

Comments

  • It is possible but it is not recomended, it bring problems, a lot of processes to save, display etc.
    It has not been designed for such purposes.
  • okay, thank you for the answer
Sign In or Register to comment.